Clients and Case Studies

Armstrong Point

Work focus on delivering zero carbon standard
Inside view of completed works

Construction Management

Challenge: To manage the construction and commercial aspect of a zero carbon industrial unit to achieve BREEAM “Outstanding” certification.


Solution: Alan and Peter were instrumental in the micro management of all aspects of the project. This included the design, selection of subcontractors and general day to day running of the project in order to complete a pioneering, sustainable industrial business park. This was the first zero energy cost industrial business park in the country to be built with an “Outstanding” BREEAM certification.


“I was extremely pleased and impressed by the tenacity of the team that delivered this ground breaking project. It was great working with such dedicated people within the building industry.”

Dave Armstrong - Owner

Manchester Piccadilly Station

External façade of the locker rooms
Changing area / Shower room

Locker Room – Construction

Challenge: To provide new shower and lockers facilities for railway station staff by replacing existing offices. Restricted access through public thoroughfare. Provision of services and drainage. Condition of existing floor and problematic levels.


Solution: Supply and setup a completely new water, drainage and electrical supplies. The material deliveries were managed outside peak pedestrian times. Strip out the existing offices and build the whole locker and shower from scratch. Floor completely levelled and re-boarded in new timber.


“We at Network Rail Manchester Piccadilly would like to pass on some feedback regarding the recent refurbishment at Manchester Piccadilly. Work has been carried out on our new locker rooms in the old G4’s offices over the last few weeks and the contractors who have attended site have been a credit to the main contractor. It is not often that positive feedback is passed on but we feel that not only were they all incredibly friendly but followed all procedures day in day out... We’ve had a quick look at our new locker room today and looks like they have done a great job.”

Manchester Piccadilly Station

Glazed external façade and ventilation grilles

External Façade Work – Property Care

Challenge: This was a high level job that required extreme care and to be performed by a team of professionals that was well trained and comfortable to working at heights. The team had to overcome restricted access and a public thoroughfare. Inspect and clean external glazed façade as well as providing new mesh to high level ventilation / cooling grilles.


Solution: Our Property care specialist team were utilised to select the right accessing system and segregate public and staff. This work was performed over a holiday period, with very short notice. Our team managed to complete the whole job on time with great levels of satisfaction to all parties involved as well as adjacent businesses. There was absolutely no disruption to the station, public or surrounding businesses and an Incident free Health and Safety.